CUSTOMER PROJECT YEAR LOCATION |
: : : :
|
Total Petrochemical South East Asia Pte Ltd Process Industry upgrading project 2012 Jurong Island |
PROJECT DETAILS:
PIB injection system for truck loading bay. Supply and Install pump, Mass flow meter, Pressure Transmitter, Temperature transmitters, control valves, E-Stop stations, Variable speed drive units, Plant lightings Instrument tubing's, cable , cable support systems, glanding & Termination works. Testing and commissioning the entire system with DCS.
|
CUSTOMER
PROJECT YEAR LOCATION
|
: : : : |
Vopak Tank Terminals - Penjuru Terminals New Tank farm Project 2012 Penjuru
|
PROJECT DETAILS:
Pump Upgrading works, Truck loading station batch controller, level & flow instruments, Local control station, cable, cable support system, ESD control system, ex. proof lighting installation, loop check, testing & commissioning works. Supply & Install Scrubber control systems. CCTV camera installation , Fibre Optic termination and hook up top the existing system
|
CUSTOMER PROJECT YEAR LOCATION |
: : : : |
Itro Pte Ltd Process industry plant maintenance project 2012 Jurong Island
|
PROJECT DETAILS:
Plant Maintenance activity- Motor overhauling work, Control valve, flow meter, temp. transmitter, pressure transmitter loop check , calibration works. Electric tracing & UPS system, air con system & air compressor system maintenance works. Plant power shutdown, Facility maintenance works.
|
CUSTOMER PROJECT YEAR LOCATION |
: :
: : |
JML maintenance Pte Ltd Green Field - Biomas Clean Coal Cogeneration(BMCC) 2012 Jurong Island
|
PROJECT DETAILS:
7000 instrument glanding & termination works. Cable laying, cable supports system, Junction box installation, Crane junction box, cable, control system installation. CCTV camera installation, Fibre optic cable termination works. Marshalling cabinet's installation works.
|
CUSTOMER
PROJECT YEAR LOCATION
|
: : : : : : : : |
Perstorp Singapore Pte Ltd SI group Singapore Pte Ltd Woodgroup International Eastman Chemicals Pte Ltd GE Energy and others Process Industry upgrading project 2012 Banyan
|
PROJECT DETAILS:
Install Motor control panels, Junction boxes. Cable laying, cable tray installation. Power isolators.
Gen set installation. Instrument installation works.
|
CUSTOMER
PROJECT YEAR LOCATION
|
: : : : : : : : |
Perstorp Singapore Pte Ltd SI group Singapore Pte Ltd Woodgroup International Eastman Chemicals Pte Ltd GE Energy and others Process Industry upgrading project 2013 Banyan |
PROJECT DETAILS:
Install Motor control panels, Junction boxes, cable laying, cable tray installation, VFD installation, and Instrument& Instrument cabling installation works. Static grounding system, motor upgrading works. 25MW Turbine tubing installation works.
|
CUSTOMER PROJECT YEAR LOCATION |
: : : : |
Vopak Tank Terminals - Penjuru Terminals New Tank farm Project 2013 Penjuru
|
PROJECT DETAILS:
72KM power & Control cable installation works. 4KM Cable ladder, cable tray installation works. 1.5KM conduit installation works. 45 nos. Earth pit and related earth cable installation works.
Power, Instrument cable glanding, termination & loop check works.
|
CUSTOMER PROJECT YEAR LOCATION |
: : : : |
Vopak Tank Terminals - Banyan Terminals Process industry Debottlenecking project 2013 Banyan Avenue
|
PROJECT DETAILS:
10nos MOV installation. 3 nos. control valve. 5nos PT, 2nos TT. MOV control panel, Engine control panel. Cable laying, cable support system. Product pipe earth bonding works, loop check, testing commissioning the entire system. Supply & Install scrubber control systems.
|
CUSTOMER PROJECT
YEAR LOCATION |
: :
: : |
JML maintenance Pte Ltd Green Field - Semcorp Multi Utility Complex-Macchi boiler & Cooling tower Project 2013 Banyan
|
PROJECT DETAILS:
Supply & Installation of 450 nos. outdoor ex. proof & non ex. proof light fittings and 150 nos. lighting pole installation works. 12 zones of fire alarm system installation works including of 4KM length cable, conduit & cable tray installation works. Electric heat trace system installation works. Marshalling panel, lighting, power & control panel installation works. Secondary earthing system installation works. Loop check, testing & Commissioning assistance.
|
CUSTOMER PROJECT YEAR LOCATION |
: : : : |
Total Petrochemical South East Asia Pte Ltd Process Industry upgrading project 2013 Jurong Island
|
PROJECT DETAILS:
Palletizer machine power, control systems design & installation. Pre & Post Power shutdown works. Ex. proof lights, cabling, cable support system, lighting panel upgrading Installation works. Pump E stop, control system upgrading works.
|