Our Latest Projects Singapore

 

CUSTOMER
PROJECT
YEAR
LOCATION

:
:
:
:

Total Petrochemical South East Asia Pte Ltd
Process Industry upgrading project
2012
Jurong Island

PROJECT DETAILS:

  PIB injection system for truck loading bay. 
  Supply and Install pump, Mass flow meter, Pressure Transmitter, Temperature transmitters, control valves, E-Stop stations, Variable speed drive units, Plant lightings
  Instrument tubing's, cable , cable support systems, glanding & Termination works. 
  Testing and commissioning the entire system with DCS.

CUSTOMER


PROJECT
YEAR
LOCATION

:

:
:
:

Vopak Tank Terminals - Penjuru Terminals
New Tank farm Project
2012
Penjuru

PROJECT DETAILS:

Pump Upgrading works, Truck loading station batch controller, level & flow instruments, Local control station, cable, cable support system, ESD control system, ex. proof lighting installation, loop check, testing & commissioning works.   
Supply & Install Scrubber control systems.
CCTV camera installation , Fibre Optic termination and hook up top the existing system

CUSTOMER
PROJECT
YEAR
LOCATION
:
:
:
:

Itro Pte Ltd
Process industry plant maintenance project
2012
Jurong Island

 

PROJECT DETAILS:

Plant Maintenance activity- Motor overhauling work, Control valve, flow meter, temp. transmitter, pressure transmitter loop check , calibration works.
Electric tracing & UPS system, air con system & air compressor system maintenance works. Plant power shutdown, Facility maintenance works.

CUSTOMER
PROJECT
YEAR
LOCATION
:
:

:
:

JML maintenance Pte Ltd
Green Field - Biomas Clean Coal Cogeneration(BMCC)
2012
Jurong Island

PROJECT DETAILS:

7000 instrument glanding & termination works.
Cable laying, cable supports system, Junction box installation, Crane junction box, cable, control system installation. 
CCTV camera installation, Fibre optic cable termination works.  
Marshalling cabinet's installation works.

CUSTOMER





PROJECT
YEAR
LOCATION

:
:
:
:
:
:
:
:

Perstorp Singapore Pte Ltd
SI group Singapore Pte Ltd
Woodgroup International
Eastman Chemicals Pte Ltd
GE Energy and others
Process Industry upgrading project
2012
Banyan


PROJECT DETAILS:

Install Motor control panels, Junction boxes.   
Cable laying, cable tray installation.
Power isolators.
Gen set installation.
Instrument installation works.

CUSTOMER




PROJECT
YEAR
LOCATION

:
:
:
:
:
:
:
:
Perstorp Singapore Pte Ltd
SI group Singapore Pte Ltd
Woodgroup International
Eastman Chemicals Pte Ltd
GE Energy and others
Process Industry upgrading project
2013
Banyan

PROJECT DETAILS:

 Install Motor control panels, Junction boxes, cable laying, cable tray installation, VFD installation, and Instrument& Instrument cabling installation works.  
Static grounding system, motor upgrading works. 
25MW Turbine tubing installation works. 

CUSTOMER
PROJECT
YEAR
LOCATION
:
:
:
:

Vopak Tank Terminals - Penjuru Terminals
New Tank farm Project
2013
Penjuru


PROJECT DETAILS:

72KM power & Control cable installation works.   
4KM Cable ladder, cable tray installation works. 
1.5KM conduit installation works.   
45 nos. Earth pit and related earth cable installation works.
Power, Instrument cable glanding, termination & loop check works. 

CUSTOMER
PROJECT
YEAR
LOCATION
:
:
:
:

Vopak Tank Terminals - Banyan Terminals
Process industry Debottlenecking project
2013
Banyan Avenue

PROJECT DETAILS:

10nos MOV installation.   
3 nos. control valve. 
5nos PT, 2nos TT.   
MOV control panel, Engine control panel.
Cable laying, cable support system. 
Product pipe earth bonding works, loop check, testing commissioning the entire system.   
Supply & Install scrubber control systems. 

CUSTOMER
PROJECT

YEAR
LOCATION
:
:


:
:


JML maintenance Pte Ltd
Green Field - Semcorp Multi Utility Complex-Macchi boiler & Cooling
tower Project

2013
Banyan

PROJECT DETAILS:

Supply & Installation of 450 nos. outdoor ex. proof & non ex. proof light fittings and 150 nos. lighting pole installation works.   
12 zones of fire alarm system installation works including of 4KM length cable, conduit & cable tray installation works. 
Electric heat trace system installation works.   
Marshalling panel, lighting, power & control panel installation works.
Secondary earthing system installation works. Loop check, testing & Commissioning assistance.

CUSTOMER

PROJECT
YEAR
LOCATION
:

:
:
:

Total Petrochemical South East Asia Pte Ltd
Process Industry upgrading project
2013
Jurong Island

 

PROJECT DETAILS:

Palletizer machine power, control systems design & installation.   
Pre & Post Power shutdown works. 
Ex. proof lights, cabling, cable support system, lighting panel upgrading Installation works.   
Pump E stop, control system upgrading works.

About Company

PECON is a growing and promising Singapore company, we started our commenced our journey in 2011 to work with Process and related industries in the undertaking of Electrical and Instrumentation Engineering service and contracts.

Read More

Connet With Us

Quick Contact

Address

POWER ENGINEERING & CONTROLS PTE LTD

Address:
12B ENTERPRISE RD, ENTERPRISE 10, SINGAPORE 627682
Tel:
+65 67107018
Fax:
+65 65703220
Website:
www.pecon.com.sg
Email:
This email address is being protected from spambots. You need JavaScript enabled to view it.